Overview
Exterior and interior renovation of partially occupied two story building, with the exterior “hardened” to withstand a wind force of 180 mph. The scope included the complete removal of the existing wood truss system, which was replaced with metal trusses and a standing seam roof, installation of impact-rated fixed windows and operable doors, removal of existing and reconstruction of two new stair towers, and necessary site/utility improvements. The existing Chiller Plant was demolished and replaced with a new 1,132 SF Utility Building. The interior work consisted of a three-phased complete demolition of MEP systems and all finishes. Part of the existing second floor Epicore Slab was removed to install a new steel pan stair with concrete treads. Additional interior work included new elevator, new ADA designed restrooms with shower facilities and new finishes, inclusive of wood stained doors, acoustical ceilings, ceramic tile, carpeting and paint.
More from Portfolio
#WeAreHedrick
Uncompromised Excellence
Our team is passionate about quality construction and bringing visions to reality with national and regional clients and their design teams for the most challenging and complex projects.
Corporate Headquarters
2200 Centrepark West Drive
West Palm Beach, FL 33409
561-689-8880
info@hedrickbrothers.com
State of Florida CGC 013137
Broward/Miami Office
101 North Riverside Drive,
Suite 208
Pompano Beach, FL 33062
561-312-0930
Space Coast Office
1002 East New Haven Avenue
Second Floor
Melbourne, FL 32901
321-610-7083
Central Florida Office
174 West Comstock Avenue,
Winter Park, FL 32789
561-315-2358
